Dia:Chelsea – New York, USA

2018 – Feasibility study and Scheme design

Delvendahl Martin Architects were commissioned by the Dia Art Foundation to undertake a feasibility study and scheme design for their gallery premises in New York. The brief was to expand their public engagement programme and improve their public presence. The study developed into the proposed refurbishment of three existing buildings owned by the foundation and situated adjacent to one another in Chelsea, in central Manhattan.

The history of Dia has been closely linked with that of West 22ndStreet since the foundation first opened in 1987. The proposal recognises this relationship and creates subtle interventions across the ground floor of the three buildings, aimed at improving circulation and Dia's street presence. A key focus has been to preserve and enhance the individual and distinct character of each building.

The main architectural principles include: maximising gallery space; creating openings between galleries; creating a new facade system of windows and doors at ground level; and designing a series of fixed and loose furniture that allows the spaces to be re-configured for different uses.

The programme can be loosely divided into ‘fixed’ and ‘transient’ elements. ‘Transient’ elements include the bookshop, lecture space and reception area. These elements form a more flexible part of the programme that can easily be reconfigured in different spaces depending on Dia’s immediate needs. Most of the ‘fixed’ programme (workshop, staff office and storage areas) is organised linearly along the one side of the site in order to maximise flexible exhibition space.

Project Team

Stephanie Thum-Bonanno

Joan Massagué Sánchez

Executive Architects

Spivak Architects